The heating and hot water for this site was supplied by four inefficient old gas-guzzling boilers.
After a spate of costly breakdowns left the occupants at the mercy of the winter weather, a plan was put together to retire these old work horses and bring the entire system into the 21st century.
After a great deal of careful planning and hard work we delivered this bright new boiler house complete with three Hoval Ultragas 2 boilers and 1200 Kw heat exchanger.
Preliminary work and separation of the hot water and heating systems meant we were able to complete this project with no interruption to the hot water supply as stipulated by the client.